Teams will receive 1-on-1’s with GM control SMEs on their current control architecture and functional supervisory controller architecture diagrams. These 1-on-1’s will also touch on the team’s plans for controlling all of their major propulsion system components. This discussion will be based on the content teams are required to submit for the Control System Review section of the WW Pre-Submission deliverable. A template for this content is posted to
SharePoint. Teams should also bring any general control questions they have with them.